Gallery
Please find below a selection of our recently completed projects. Click on any images to enlarge.
Hendwr Anaerobic Digester
We excavated and installed utilities (gas, water, electric and data ductings and pipes). We installed the groundsource heat loop and fusion welded the pipework. We excavated and formed a slurry lagoon with earth bunding and batters. We erected a steel portal framed building and installed associated concrete works, i.e. concrete pads, floors, concrete ring chambers for sumps.
We continue to maintain the mechanical engineering.
The team at PD Construction were very good to work with, versatile and word very well with the multiple trades and disciplines on site to the high diligence levels required for a technical and bespoke project. PD Crushing added many beneficial design elements to the project to assist.
Philip Hughes
Dee Valley Breaks Ltd
We excavated and installed all utilities, including water, electric, drains, gas and data for a luxury holiday let raised on stilts on a hillside. We constructed and erected a water tower for a sprinkler system, and installed multiple tanks to pump the water from the mains water supply to the property. We installed a 10 person septic tank and drainage field. We excavated for foundations to install steel work to hold the cabin on stilts on a sloping field. We formed a road and hammerhead turning space, and carried out all landscaping around the property. We supplied and installed boulders to retain soil to create disabled access.
I highly recommend PD Construction & Plant Ltd. They were very professional carrying out complex groundworks with difficult access on a very steep embankment for our bespoke luxury holiday cabins. They were a great help from start to finish; from carrying out a percolation test, working with Building Control on our behalf, to the design, supply and installation of the septic tank and drainage systems. The staff were efficient and worked to a very high standard, leaving the site clean and tidy. Their experience, knowledge and qualifications were evident in providing practical solutions for our project.
Lisa Jones, Director
Sensory Garden at Hollybank Care Home
We were given a brief by Hollybank to design a safe, user friendly sensory garden for use by elderly residents with dementia. The site was cleared of all concrete steps, uneven paving slabs and the garden was landscaped so as not to have any steps or steep gradients. We block paved a meandering path and laid astro-turf to create aesthetically pleasing garden for the residents. We installed larch fencing with a wavy top, and a sensory table top and wall mounted panels to create a stimulating visual and touch feature. We made bespoke raised bed planters which could be planted by residents from their wheelchairs. We sourced and installed a unique log bench.
Hollybank is a small residential care home in Wrexham and we provide Dementia care for older people. In February 2019 we commissioned P D Construction to refurbish our rear garden and make it into a safe, but fully accessible sensory area for our residents to enjoy. From the outset they were easy to deal with, very professional in their outlook and obviously knowledgeable in their field. Once the design was agreed, the work was carried out to a very high standard and completed within the given timescale at a very competitive price. Darren Davies spent some considerable time researching in depth the things that are acceptable in such a garden in order to provide effective stimulation and provoke the interest of the people we have living with us. We are exceptionally happy with the garden as are our governing bodies, residents and their families. I would have no hesitation in using them again, or recommending them to anyone else.
Janet Bailey, Owner
Rhug Drive Thru
We were commissioned by Lord Newborough to build the first Farm Drive Thru in the UK. We completed extensive groundworks, installed all utilities, surface water drainage and foul water drainage, including a new sewerage treatment plant to service the site. We formed a road and car parking areas, finished with coloured stone and landscaped the embankments. We installed steel bollards and kerbs, and laid block paving for disabled parking. We excavated and installed foundations ready for installing the steel framed building. We then roofed, timber panelled, clad with cedar and insulated the building.
PD Construction completed the unique Drive Thru project to a very high standard required for a high through put facility. The team were very accommodating and good to work with.
Lord Newborough
Fairview
Fairview is a grand design property nestled on a hillside. We were commissioned to demolish the existing bungalow, clear the site, excavate for foundations for the new build, and landscape with concrete panels to create triangular terraced areas. We installed water, a water harvesting tank, electric and data, and a new septic tank with drop chamber manholes, to the new property.
PD Construction created amazing terracing and landscaping as well as completing all the groundworks for my contemporary ‘grand designs’ property. Nothing was too much trouble and they coped with my changes of direction with good humour and forward thinking. I would not consider having anyone else and they are coming back to complete phase two very soon.
Caroline Williams
Rhos y Gwaliau Outdoor Education Centre
We were contracted to source a bespoke 90 person sewerage treatment plant to fit in the existing footprint of the old tank. We excavated and removed the existing steel tank. We installed a new Viltra Oxcrete 90 bespoke sewerage treatment plant to service the Centre. We landscaped the surrounding area, widened the road, formed a new parking area and installed kerbing.
We are very happy with the installation and service from Paul, Darren and their team. They designed a system that fits our needs perfectly now and into the future, whilst keeping disruption to a minimum. We are very happy with the final product which is quiet, odour free and discreet. They really know their stuff and I would most certainly recommend them to anyone.
Ed Jones
Hendwr Caravan Park
We have carried out extensive groundworks to upgrade the services at a popular caravan park in Llandrillo. We excavated and installed a new mains sewer down the centre of the park, with manholes spurred off in preparation for new static caravan bases. We excavated and installed ducts for electric, gas, data and a new water main. We excavated and installed concrete bases to site the new static caravans.
PD Construction have carried out two phases of development for us at Hendwr Caravan Park during our winter shutdown periods, always finished on time and on occasion in difficult winter ground conditions always leaving a tidy site. In summary tidy, safe, timely with added good design ideas along the way.
John Hughes
Forestry Roads
We have completed numerous contracts for the formation and reinstating of forestry roads. Customers have ranged from farmers, private woodlands, and managed estate woodlands. Contracts have involved the cutting of new roads, widening and re-surfacing existing roads, installing culverts and run off washes to divert water. We have excavated large areas to create turning areas, and bases for log stacking. We have cut roads through steep gradients, with rock outcrops.